PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Duct work leakage test at the 2nd floor Facing North.jpg Connecting copper piping to the 2nd floor VAV boxes Facing East.jpg Installed sheathing at Room 151 Facing South.jpg Laying out block at 1st floor Locker Rooms Facing North.jpg Poured concrete at the Boiler-Electrical Room Facing West.jpg Closing up the parapet at the West Elevation.jpg
Previous pageNext page Connecting copper piping to the 2nd floor VAV boxes Facing East
Connecting copper piping to the 2nd floor VAV boxes Facing East